Standards · ASTM E2026 · ASTM E2557

ASTM E2557 vs. ASTM E2026: what lenders mean by PML and SRA.

Two ASTM documents govern seismic due diligence for commercial real estate. One defines the terms and methods; the other sets the minimum practice for the due-diligence assessment.

ASTM E2026ASTM E2557 (current edition)
TitleStandard Guide for Seismic Risk Assessment of BuildingsStandard Practice for Probable Maximum Loss (PML) Evaluations for Earthquake Due-Diligence Assessments
Document typeGuide — defines terminology, investigation levels, and methodsPractice — sets minimum scope and reporting for a due-diligence PML evaluation
Key outputsSEL, SUL, building stability, site stabilityLoss estimate for lender due diligence, reported using E2026 terminology
Current editionE2026-24ASTM E2557 (current edition)

Why "PML" is a legacy term

"Probable Maximum Loss" was used inconsistently across the industry. ASTM E2026 replaced it with defined measures: SEL (Scenario Expected Loss) and SUL (Scenario Upper Loss), usually reported for the 475-year (10% in 50 years) ground motion. Lenders still say "PML report" when they mean an SRA. For the agency thresholds, see the 20% and 40% SEL lines explained, and for insurance-driven orders, PML reports for earthquake insurance.

Which one does my lender want?

Often both. Fannie Mae, for example, requires the Level 1 SRA to meet ASTM E2026 and E2557 (Multifamily Guide 505.02). Your lender's scope letter states the required standard and edition.

How we report

We prepare our reports to ASTM E2026-24 and, where the lender requires it, ASTM E2557. Every report we deliver states SEL and SUL and is PE-reviewed and stamped.

Related: Level 0, Level 1, and Level 2 assessments · Fannie Mae seismic requirements

Ready to order? Send us the address and your lender's scope letter and we will respond the same business day (Mon–Fri). Not sure you need a report? Run the free PGA check first.